The principle
Footings and cure time are non-negotiable. Posts set 600 mm deep, fittings torqued and thread-locked, and cast concrete left the full 28 days — green concrete shatters under a first lift.
Materials
- Straight eucalyptus log Ø180-220mm ×1.6m
- 2 short handle logs
- exterior oil
- optional galv banding
Tools
- Chainsaw
- drill
- Forstner bit
- orbital sander
- blowtorch
- wire brush
Reclaimed from
Mil Martins & Irmão sawmill + site timber